Highrail Through The RockiesField to lake Louise & Back: Taped from the back of a CP Highrail Pickup in early June 2000 in perfect weather. No bugs on the windshield (no windshield!), no wipers, just a straight ahead view with a locked down camera. Only problem was insufficient light from the pickup's headlights, so I've left out the Spiral Tunnel interiors. Great snow covered mountain scenery. Ride the Hill! No narration, on screen locations.
|
Award Value: 169 Points Earn points for free DVDs. Signup free.
| Item #: | HRLB-DVD |
| DVD Length : |
2 Hours, 00 Mins |
| Producer: | Highball Productions |
| Aspect Ratio: |
Full Screen | | Disc Type: | DVD |
| Region Code: | 0 Worldwide NTSC |
|